- Engineering involves designing the tank’s structure and systems to safely hold pressurized gas.
- Procurement is the process of buying all the special materials, equipment, and services needed to build it.
- Construction is the physical work of building the tank, often by carefully assembling steel plates on site.
- These three phases are tightly connected to ensure the project is completed on time, on budget, and safely.
- The final result is a very strong and efficient storage tank, crucial for the energy industry.